Frequently asked questions
Straight answers about Roveya Admin, Ops and Hub, how the platform handles your data, and the operational questions our customers ask most.
86 answers in 11 topics
Plans, seats, onboarding, terms and evaluation
We don't offer an empty self-serve trial, because Roveya is most useful once it holds your own sites, people and templates. Instead you get a guided demo and a free 14-day Evaluation Sandbox: your organisation's own workspace in a separate copy of Roveya, loaded with sample data, so your team can try Admin, Ops and Hub properly before you commit. It is for sample data only, so please don't add real personal data. To try the mobile apps, choose the Evaluation Sandbox when you sign in to Roveya Ops or Roveya Hub. Book a demo to get access.
From PricingBecause we set Roveya up for you rather than leaving you with a blank system. Onboarding covers configuring your workspace, users and roles, importing your clients, sites, people and assets, building your inspection, RAMS and finance settings, training your office and field teams, and supporting you through go-live. It is a one-off fee, fixed per plan, and agreed before you sign.
From PricingThe minimum term is 24 months from go-live. Your seat prices are locked for the whole term. After 24 months the agreement renews annually unless either side gives 90 days' notice. You can pay annually in advance at the standard price, or monthly at about 15% more.
From PricingAn office seat is for people who manage the operation in Roveya Admin and Roveya Hub: planners, managers, compliance, finance and directors. It includes the Roveya Ops app too, so supervisors who work in the office and on site need only one seat. A field seat is for operatives who only use the Roveya Ops mobile app to receive work, complete inspections, capture evidence and sign RAMS. Field seats cost a fraction of office seats, so you can put your whole workforce on Roveya.
From PricingNo. On the Professional plan, the RAMS builder, compliance renewals, applications for payment, CIS deductions and domestic reverse charge VAT are all included. Many tools sell these as add-ons or leave them to separate systems; Roveya keeps them on the same record as the work.
From PricingYou can add office or field seats at any time; they are charged pro rata to the end of your current billing period and run to the same end date. The number of seats in your agreement is the minimum for the term, so seats can be reduced at renewal rather than mid-term.
From PricingNo. Prices are in pounds sterling per seat per month and exclude VAT. Roveya's VAT registration is in progress; once it completes, VAT is added at the prevailing rate.
From PricingYour subscription is collected by Direct Debit through GoCardless. You set it up once before go-live, so there are no payments to chase each month or year. The onboarding fee can be paid by instant bank payment, by bank transfer, or by card through a secure payment link. A card fee equal to our cost of accepting the card, currently 2.8% plus 20p, is added when you pay with a business card. Paying by bank, or with a personal card, costs nothing extra.
From PricingEvery plan has a 99.5% monthly availability target. Support is by in-app help and email to support@roveya.io in Business Hours, Monday to Friday, 09:00 to 17:30 UK time. There is no telephone support. Professional and Enterprise have faster response targets, and Enterprise customers have a named contact. Response times and service credits are set out in the Service Level Commitments you receive with your Order Form.
From PricingEnterprise is quoted, because it depends on the number of companies, sites and integrations involved. It includes everything in Professional plus group structures, extended audit history and a dedicated onboarding manager. Talk to us and we will scope it with you.
From PricingDemos and first steps
Start with the sites, teams and workflows you want to connect, and the systems you use today. Book a demo to explore the platform against your operation, or contact the team and select Pricing or Implementation to discuss your requirements.
From HomeYes. A demo is a working session around your sites, teams, workflows and existing systems rather than a slide presentation.
From ContactBoth are mobile applications for iOS and Android. Current release status is stated on the Downloads page.
From ContactHow Admin, Ops and Hub fit together
Roveya brings together projects, people, sites, inspections, work orders and commercial records. It is designed for organisations coordinating work across field teams and the back office, where details would otherwise be spread across spreadsheets, messages and separate systems.
From HomeAdmin supports the back office, Ops supports field teams carrying out work and checks, and Hub supports managers reviewing exceptions and approvals on the move. They work from the same operating record, with distinct roles in the workflow. Explore how the platform fits together.
From HomeFor example, an inspection finding can be linked to follow-up work, keeping the issue, evidence and recorded outcome together. Office teams use that context for review and reporting rather than relying on a separate message or spreadsheet. People still decide and move the work forward.
From HomeWorking without signal in Roveya Ops and Hub
Nothing changes for you. Keep working: answers, photos, notes and signatures are saved on the device as you go, and the task carries on to completion.
From Offline WorkingEvery item shows its sync status. Queued work is marked as waiting, and the status clears once it has reached the operational record.
From Offline WorkingYes. Photographs are taken and attached to the job on the device, then uploaded with the rest of the record when signal returns.
From Offline WorkingNo. Roveya detects when the connection returns and sends queued work automatically, in the order it was captured.
From Offline WorkingThe work stays queued on the device and Roveya tries again. Nothing is discarded, and the item stays marked until it has been sent.
From Offline WorkingAdmin is the office web app and runs with a connection. It shows field work as soon as Ops or Hub has synced it.
From Offline WorkingYes. Reviews, approvals and actions taken without signal are held on the device and sent when the connection returns.
From Offline WorkingRoveya Ops supports offline-aware workflows. Activity is captured and queued on the device and synchronised in the order it was captured when signal returns.
From Security & TrustWork, evidence and issues on site
The work record holds its progress, evidence and any linked issue. A problem can be assigned for follow-up without treating the original work as complete. The recorded outcome shows what happened next.
From Field OperationsPhotographs, notes and inspection responses are held with the work or check they support. A reviewer with access can open that context from the record, rather than assemble a second evidence trail from messages.
From Field OperationsField Operations focuses on the day’s work, checks, evidence and issues. Project Management places that activity within the wider project: its programme, people, requirements and commercial position. They refer to the same work rather than separate copies.
From Field OperationsRAMS, certifications and audit history
No. Issue, viewing and signing are separate recorded states. The per-person view shows who received the document, who viewed or signed it and what is outstanding against the version concerned.
From Compliance & RAMSThe certification record is shared. Compliance teams review its status and evidence; people and operations teams read the relevant readiness position. That avoids maintaining a second certification record for the same person.
From Compliance & RAMSThe history connects recorded actions to the user, time, record and version. It supports a review of how the document was created, revised, approved, issued and acknowledged, alongside the evidence retained with it. It does not replace the responsible person’s compliance judgement.
From Compliance & RAMSFrom first conversation to delivery
Yes. The issue holds its site, priority, owner, due date, evidence and recorded resolution in the project context. A manager can follow the problem through delivery rather than maintain an unrelated issue list.
From Project ManagementNo. It shows the requirements relevant to the project. The full RAMS, certification and other compliance records remain in Compliance & RAMS and are shared with the project view.
From Project ManagementNo automatic valuation is implied. Recorded work and evidence support commercial review. Valuation, application, certification, invoicing and payment remain distinct stages in Finance & AfP.
From Project ManagementThe client record brings together contacts, sites, related projects and recorded conversations. Opportunities and follow-up activities keep their connection to that client, so account history is available in the operational context.
From CRM & SalesNo. Won work moves into project set-up and delivery. The opportunity remains part of the commercial history, while Project Management holds the programme, people and work that follow. Completion and invoicing are later stages.
From CRM & SalesActivities such as calls, visits, meetings and follow-ups are recorded against the client and opportunity. A named owner and due date make due and overdue follow-up visible, instead of leaving the next step in an individual inbox.
From CRM & SalesApplications, invoices and payments
An Application for Payment records value requested for a period. Certification records the value certified; the invoice is a separate linked commercial record. A payment records money received, including any part-paid or outstanding position. They should not be treated as interchangeable states.
From Finance & AfPNo. Work, hours, inspection results and photographs support the commercial review. A person reviews the relevant records and valuation; evidence capture does not itself certify an amount or authorise payment.
From Finance & AfPReturn submission to HMRC and bank-feed matching are not included. Finance & AfP keeps the operational commercial record connected to the work. Check the Integrations directory for the individual status of any accounting connection you need.
From Finance & AfPTenancy, access, AI and exports
The Security & Trust page describes tenant separation, role-based access, auditability and data portability. Procurement teams can request further information from there.
From ContactEach organisation is a tenant. Users, sites, projects, people and records are scoped to that tenant rather than shared across a common workspace.
From Security & TrustAccess follows the role, and within it the organisation, project and site context. A field operative sees the work assigned to them; a compliance manager sees the inspection and document position.
From Security & TrustYes. Reports and registers export as CSV or XLSX, and documents are generated from the record they belong to. Reporting datasets and API access are planned.
From Security & TrustAI is used to assist: drafting, summarising, surfacing information and suggesting next actions. It does not approve records, sign documents or make financial decisions.
From Security & TrustEach connection states its direction, carries only the permissions it is granted, records changes against the account and can be revoked.
From Security & TrustUse the request on the Security & Trust page. We share the platform and security information that exists and is approved for release.
From Security & TrustConnections, help and access
The Integrations directory shows the status of each listed connection: Available, In development or Planned. Check the individual status when assessing fit; a named or planned connection should not be treated as available.
From HomeRoveya connects to finance, identity, communications and reporting systems. Each connection carries its own status (available, in development or planned) in the Integrations directory.
From ContactStart in the Help Centre for product guidance, or send a support enquiry using the contact form.
From ContactRoveya Admin runs in the browser. Sign in with the organisation account assigned to you; access is controlled by your organisation and role.
From ContactAnswers from our Insights articles
An application for payment requests value for a period. The client's certificate or payment notice states their position on that value. An invoice then requests the certified amount, and a payment is the money actually received, which may be less or arrive late. Keeping these as separate linked records shows, per project and per client, what has been applied for, certified, invoiced and received.
Read: Why the valuation is the hardest part of the monthVariations are most often struck out because nothing was recorded at the time of instruction. If the instruction, the extent of the work and the date it was done exist only in a supervisor's memory, there is no paper trail to evidence the claim. Raising the variation on site when it is instructed, with who gave the instruction, what it covered and photographs, gives the valuation a shared set of facts.
Read: Why the valuation is the hardest part of the monthUnder the Construction Industry Scheme, contractors deduct 20% from the labour element of payments to registered subcontractors, 30% for subcontractors who are not registered, and nothing for those with gross payment status. Materials are not subject to deduction. The rate must reflect each subcontractor's verified status, and the deduction must match the payment that actually goes out.
Read: Why the valuation is the hardest part of the monthThe Construction Act (the Housing Grants, Construction and Regeneration Act 1996, as amended) requires construction contracts to set a due date and a final date for payment. The payer must issue a payment notice stating the sum considered due, and must serve a pay less notice to pay less than the notified sum. Applications that arrive late or without backup tend to be valued at whatever the other side can see.
Read: Why the valuation is the hardest part of the monthIt means creating the record at the moment the work is done, by the person doing it. A photograph is attached to the specific item it evidences, and the person, site and time are recorded by doing the work rather than typed afterwards. The office then receives a finished record to review, instead of unlabelled photos, paper checklists and messages that have to be matched to jobs.
Read: What changes when evidence is captured at sourcePhotographs forwarded in batches lose the link to the check, door or asset they were taken to support. Someone in the office then has to match them to jobs, often by phoning the person who took them, and images nobody can place end up in a miscellaneous folder. The time cost is real, but the bigger loss is context: a forwarded image is just a picture, not evidence.
Read: What changes when evidence is captured at sourceMake it easier than the alternative. Evidence should be a field on the check rather than a separate step, the site and job should already be known from the assigned work, capture should work without signal and send later, and results should reach the office without forwarding. Ask only for what the work genuinely needs, usually a photograph, a pass or fail and a short note.
Read: What changes when evidence is captured at sourceThe person who carried out the work and made the judgement, not whoever typed the record up. Records entered later tend to carry the name of the person doing the data entry, which matters for competence-dependent work such as inspections, sign-offs and permit closures. Capturing at source records the right person automatically, because the record is created by the person doing the work.
Read: What changes when evidence is captured at sourceInspection evidence is reliable when it establishes what was observed, where, by whom and when, tied to the activity rather than just a clock. A photograph alone may prove something existed, but without the site, inspection and activity record it cannot show what work it evidences. Auditors, clients and insurers are asking whether the record can be relied on, not simply whether a check happened.
Read: Why inspection evidence loses value when it is captured too lateAn audit trail is a chronological, attributable record of who did what, when, and against which record. It should be detailed enough for a third party to reconstruct events without relying on anyone's recollection. In practice, each finding sits against the correct site, unit or asset, names the competent person who made it, and carries its supporting evidence on the individual response.
Read: Why inspection evidence loses value when it is captured too lateAdd a correction rather than editing the original. The new entry should say what changed, who changed it and why, leaving the submitted record intact. A record that can be quietly rewritten cannot be relied on by anyone else, however accurate it happens to be. The same applies to evidence added after an inspection: the record should show it was added later and by whom.
Read: Why inspection evidence loses value when it is captured too lateConfirm that the record is against the correct site, unit or asset; that it names the person who completed the check; that supporting evidence is attached to the individual response it supports; that required failures have been resolved or escalated; and that the record has been submitted, not just saved on a device. If any of these is missing, the record is not yet defensible.
Read: Why inspection evidence loses value when it is captured too lateOn sites that require CSCS cards, an operative with an expired card is likely to be turned away at induction or the gate, because the principal contractor's checks rely on a current card. The business then faces a delay, a substitution or a hurried decision. The card has to be renewed before it can be relied on, which is why expiries are best found months ahead.
Read: The certification you did not know had expiredHold each certification against the person, with its expiry date and the evidence behind it, and show its state explicitly as valid, expiring, expired or missing. Link requirements to roles and jobs so readiness is read against the work. Set warnings early enough for each qualification's renewal lead time, and use one shared record across people, compliance and operations rather than separate spreadsheets.
Read: The certification you did not know had expiredA training matrix maps people against the competencies and certifications their roles and jobs require. Its real purpose is operational: answering whether a specific person can do a specific job, on a specific site, today. A useful matrix shows what is blocking someone's readiness, such as an expired card or a missing IPAF certificate, so deployment decisions are made with the facts in view.
Read: The certification you did not know had expiredSubcontractor and agency cards are usually checked once, when the person first arrives, and then sit outside the business's own records. The check is often made from a photograph sent the night before, with no easy way to see that the card expires next month. Holding those certifications against the person, with expiry dates and evidence, makes the gap visible before deployment.
Read: The certification you did not know had expiredMobilisation should record the client and contract, including who can issue instructions; the sites, blocks and access arrangements; the team and their roles; how the work is divided into packages and which go to subcontractors; required documents such as RAMS and permits, each with an owner; the certifications the work demands; and the commercial set-up, including valuation dates, retention terms and subcontractor CIS status.
Read: Mobilisation is the cheapest place to fix a projectInsurance, RAMS for their own packages, evidence of the competence of the people they plan to send, and their CIS status are all easier to collect before work starts than after a month on site. Checking CIS status before the first payment avoids problems surfacing in the payment run, and knowing who will be on site means RAMS can be issued and acknowledged against named people.
Read: Mobilisation is the cheapest place to fix a projectSet it up as separate blocks or areas, with their levels, rather than as one site. Every inspection, issue and photograph is then recorded against the right location from day one, so a question such as the snagging position on one block can be answered by filtering. Restructuring later means sorting hundreds of existing records by hand, which is slow and error-prone.
Read: Mobilisation is the cheapest place to fix a projectAt the end of the first week. The review is not a progress meeting but a check that the structure matches the job as it actually turned out: the areas are right, the team list is complete, the documents have owners and the commercial dates are recorded. Anything found at that point costs minutes to change, compared with far more at the first valuation.
Read: Mobilisation is the cheapest place to fix a projectAn asset is available when it is in a known place, inspected, serviceable and not committed to anything. Assets that are allocated to a project, checked out to a named person, awaiting inspection, under repair or out of service are not available, even though they appear on the register. Availability answers what can be sent, where and when, which an ownership count cannot.
Read: Availability is not a count of what you ownUnder LOLER, lifting equipment used to lift people, including scissor lifts and other MEWPs, needs a thorough examination by a competent person at least every six months, or in line with a written scheme of examination. Most other lifting equipment is examined at least every twelve months. Because the due date is known in advance, it should sit alongside allocation so planners can work around it.
Read: Availability is not a count of what you ownThe asset should be withdrawn from use straight away and a fault opened, without waiting for the office to catch up. If the failure is only reported by phone, the register can keep showing the machine as serviceable and it may be sent out again. Recording the failed check where it happens keeps the availability figure accurate and starts the repair process.
Read: Availability is not a count of what you ownRecord every transfer as a step: the asset, the receiving project and site, the person taking custody, its condition and the expected return. Plant moved directly between sites without passing through the yard is the hardest to track, because the register still shows it on the first job and the original return date belongs to an allocation that has quietly ended.
Read: Availability is not a count of what you ownRoveya Admin is the web back office for projects, people, compliance, commercial records, assets and reporting. Roveya Ops is the field app operatives use to check in, complete inspections, capture photographs and signatures, raise issues, read site documents and run lone-worker sessions. Roveya Hub is the manager's app, bringing approvals, overdue check-ins, incidents and RAMS to read to the manager, each with its context.
Read: Three interfaces, one record: how Roveya is structuredField, office and management work in different conditions. Operatives use phones, often one-handed, with gloves on and without signal. Office work is dense and comparative and belongs on a large screen. Managers need a short list of decisions with context. A single interface built for all three tends to be too complicated for the field and too thin for the office.
Read: Three interfaces, one record: how Roveya is structuredRoveya Ops and Roveya Hub are built to keep working without signal. Work, evidence and decisions are held on the device in the order they were made and sent automatically when the connection returns. Roveya Admin is an office web app that runs with a connection and shows field work as soon as Ops or Hub has synced.
Read: Three interfaces, one record: how Roveya is structuredAn operative running a lone-worker session in Roveya Ops has scheduled check-ins and an SOS. If a check-in is missed or the SOS is raised, the alert reaches a manager in Roveya Hub with the person, their role and their last device location. Because both apps use the same record, the manager is looking at the same session, not a copy of it.
Read: Three interfaces, one record: how Roveya is structuredIssuing RAMS means the document has been sent. Acknowledging it means a named person has confirmed they have read and understood it, against a specific version. Issued is a fact about the sender; acknowledgement is a fact about each person doing the work. In between sits viewed, when the person has opened it. A document can be issued and never viewed, or viewed and never signed.
Read: The difference between issued and acknowledgedYes. A signature is evidence only for the version it was given against, so acknowledgements of a previous revision do not carry over. When a method statement changes, the new version should go to the people it applies to and the acknowledgement position should start again from that version. A signature against a superseded revision is misleading because it looks complete.
Read: The difference between issued and acknowledgedEach operative who will do the work should be named and asked to acknowledge the RAMS themselves. A RAMS sent to a subcontractor's office has been issued to a company, not to its people, so a single acknowledgement can stand in for a team the main contractor has never seen. Paper sheets kept in a foreman's van leave the main contractor without a usable record.
Read: The difference between issued and acknowledgedRecord the talk against the people who attended, at the time it is given. Signatures can be captured in turn on one shared device as it passes round the group, or each person can acknowledge on their own phone. Either way the attendance sits with the talk, rather than on a paper sheet that has to reach the office and can be lost or illegible.
Read: The difference between issued and acknowledgedIt means the app assumes the connection will often be missing and lets work carry on as if it were there. Answers, photographs, notes and signatures are saved on the device as the operative goes, held in the order they were done, and sent automatically when signal returns. Failed sends stay queued and marked, and documents needed for the job can be read offline.
Read: Designing for the signal you do not haveWhen an app treats offline as an error, forms fail to submit, photographs are lost in basements and operatives are told to try again later. People respond by taking photos on their own phones, writing on paper and entering everything at the end of the shift. The software ends up used after the work rather than during it, which removes most of the reason for having it.
Read: Designing for the signal you do not havePhotographs are the largest items an operative sends and the most likely to fail on a weak connection, so they should not hold the rest of a check hostage. The answers can be sent when possible and the photographs follow, with the item clearly showing which part is still waiting. Nothing should be discarded if a send fails; it stays queued until it has gone.
Read: Designing for the signal you do not haveTest it in the places it will be used. Start an inspection with signal, walk into a basement and finish it there. Take photographs offline, then reconnect on a weak signal rather than good Wi-Fi. Leave work queued overnight and check what the operative and the office each see in the morning. Force a send to fail and confirm the app says what failed and what to do.
Read: Designing for the signal you do not haveNext step
Ask the team, or see Roveya working against your own sites and workflows.